基于离散时间描述的电石法聚氯乙烯生产的计划优化

王宇红1, 连雪1, 高小永2, 冯振辉1, 黄德先3, 拜建勋4   

  1. 1. 中国石油大学(华东)信息与控制工程学院, 山东 青岛 266580;
    2. 中国石油大学(北京)海洋工程研究院, 北京 102249;
    3. 清华大学自动化系, 北京 100084;
    4. 新疆中泰化学阜康能源有限公司, 新疆 乌鲁木齐 830026
  • 收稿日期:2016-09-13 修回日期:2016-10-07 出版日期:2017-05-05 发布日期:2017-05-05
  • 通讯作者: 高小永,工学博士,助理研究员,研究方向为复杂工业过程系统工程。
  • 作者简介:王宇红(1970-),男,教授。E-mail:Y.H.Wang@upc.edu.cn。
  • 基金资助:
    国家自然科学基金(61273039)及国家高技术研究发展计划(2013AA040702)项目

Planning optimization of PVC production by calcium carbide method based on discrete time representation

WANG Yuhong1, LIAN Xue1, GAO Xiaoyong2, FENG Zhenhui1, HUANG Dexian3, BAI Jianxun4   

  1. 1. College of Information and Control Engineering, China University of Petroleum, Qingdao 266580, Shandong, China;
    2. Institute of Ocean Engineering, China University of Petroleum, Beijing 102249;
    3. Department of Automation, Tsinghua University, Beijing 100084, China;
    4. Xinjiang Zhongtai Chemical Fukang Energy Co., Ltd., Urumqi 830026, Xinjiang, China
  • Received:2016-09-13 Revised:2016-10-07 Online:2017-05-05 Published:2017-05-05

摘要: 目前,电石法聚氯乙烯(PVC)的计划优化问题少有研究。为解决这一问题,本文建立了电石法PVC全流程生产过程多周期的计划优化模型,即混合整数非线性规划(MINLP)。电石法PVC的全流程生产过程,包括原料供应、电石生产、盐水电解、氯乙烯(VCM)聚合以及PVC的交货。基于离散时间的表示方式,考虑原料成本、库存成本、交货延迟成本以及电耗成本,以成本最小为目标,合理分配生产设备的工作状态与生产速率、电量供应与原料供应等问题。为降低能量损耗,提高企业的经济效益,根据工业实际数据,给出了电石炉与电解槽非线性耗电特性的描述分析。最后,通过计划优化案例的求解和分析,所提出的全流程模型在能耗方面比单独优化降低了9.0%,总成本降低了8.1%,验证了所提模型的可行性。

关键词: 电解, 过程系统, 聚合, 聚氯乙烯, 计划优化

Abstract: At present,polyvinyl chloride (PVC) by calcium carbide method had few studies in planning optimization. In order to solve this problem,a mixed integer nonlinear programming (MINLP) planning optimization model was established. A plant-wide process of PVC by calcium carbide method including raw material supply,calcium carbide production,salt water electrolysis,vinyl chloride (VCM) polymerization and the delivery of PVC was investigated in this paper. Considering the raw material cost,inventory cost,delay cost and electricity consumption cost,the working state and production rate of equipment,electricity supply and material supply were determined optimally based on the discrete time representation in order to minimize the total cost. According to the actual industry data,nonlinear electricity consumption characteristics of calcium carbide furnaces and electrolytic bathes were studied to reduce energy loss and improve the economic profits. A case study was provided to verify the effectiveness of the proposed model. The results showed that the proposed model is superior to the separate model in energy saving and total cost by 9.0% and 8.1% respectively.

Key words: electrolysis, process systems, polymerization, PVC, planning optimization