[1] 李广群,孙立刚,毛平平,等. 天然气长输管道压缩机站设计新技术[J]. 油气储运,2012(12):884-886.[2] 唐善华,陈向新. 关于西气东输管道压缩机站的优化布置及机组配置的探讨[J]. 石油工程建设,2003(1):12-14.[3] 于泽淼,冯霄. 以最小为目标的氢气分配网络优化[J]. 化工学报,2011,62(7):1951-1956.[4] dos Santos S P,Bittencourt M A S,Vasconcellos L D. Compressor station availability:Managing its effects on gas pipeline operation[C]//2006 International Pipeline Conference. American Society of Mechanical Engineers,2006:855-863.[5] Kurz R,Ohanian S,Lubomirsky M. On compressor station layout[C]//ASME Turbo Expo 2003,collocated with the 2003 International Joint Power Generation Conference. American Society of Mechanical Engineers,2003:1-10.[6] 常兆光,王清河,杜彩凤. 应用统计方法[M]. 北京:石油工业出版社,2009.[7] 郑建国,陈国群,艾慕阳,等. 大型天然气管网动态仿真研究与实现[J]. 计算机仿真,2012,29(7):354-357.[8] 赵俊,陈永昌,朱锋,等. 利用 SPS 模拟西气东输管道压气站单机失效问题及建议[J]. 石油规划设计,2012,23(5):43-46.[9] Learn S,Cooper C,Yip J. Pipeline design for availability:Linepack mitigation[C]//PSIG Annual Meeting. Pipeline Simulation Interest Group,2013.[10] 王小伍,华贲. 液化天然气、管道天然气与煤制天然气的比较分析[J]. 化工学报,2009,60(s1):35-38.[11] 郑云萍,肖杰,孙啸,等. 输气管道仿真软件 SPS 的应用与认识[J]. 天然气工业,2013,33(11):104-109.[12] 杨毅,吕晓华,魏凯,等. 输气管道的典型瞬态工况分析[J]. 天然气工业,2011,31(7):71-73.[13] 李玉星,姚光镇. 输气管道设计与管理[M]. 北京:中国石油大学出版社,2009. |