[1] DHOLE V R,LINNHOFF B. Total site targets for fuel,co-generation,emissions,and cooling[J]. Computers & Chemical Engineering,1993,17(s1):S101-S109.
[2] HU C W,AHMAD S. Total site heat integration using the utility system[J]. Computers & Chemical Engineering,1994,18(8):729-742.
[3] KLEMEŠ J,DHOLE V R,RAISSI K,et al. Targeting and design methodology for reduction of fuel,power and CO2 on total sites[J]. Applied Thermal Engineering,1997,17(8/9/10):993-1003.
[4] RODERA H,BAGAJEWICZ M J. Targeting procedures for energy savings by heat integration across plants[J]. AIChE Journal,1999,45(8):1721-1742.
[5] BADE M H,BANDYOPADHYAY S. Minimization of thermal oil flow rate for indirect integration of multiple plants[J]. Industrial & Engineering Chemistry Research,2014,53(33):13146-13156.
[6] CHANG C,WANG Y,FENG X. Indirect heat integration across plants using hot water circles[J]. Chinese Journal of Chemical Engineering,2015,23(6):992-997.
[7] SONG R,FENG X,WANG Y. Feasible heat recovery of interplant heat integration between two plants via an intermediate medium analyzed by Interplant Shifted Composite Curves[J]. Applied Thermal Engineering,2016,94:90-98.
[8] WANG Y,FENG X,CHU K H. Trade-off between energy and distance related costs for different connection patterns in heat integration across plants[J]. Applied Thermal Engineering,2014,70(1):857-866. |