基于评估模型的化工装置投入产出

王妙云;刘海龙;谌湘临;黄家征   

  1. 华中科技大学机械学院;石化盈科信息技术有限责任公司

  • 出版日期:2007-01-25 发布日期:2007-01-25

Analysis of chemical plant production based on evaluation model

WANG Miaoyun;LIU Hailong;CHEN Xianglin;HUANG Jiazheng   

  1. Huazhong University of Science and Technology;Petro-Cyber Works Information Technology Co.,Ltd.
  • Online:2007-01-25 Published:2007-01-25

摘要: 摘 要:针对化工装置生产过程中计量方式的多样性以及计量时效的滞后性等问题,通过引入装置界区和评估模型的概念,提出了一套基于“评估模型”的装置投入产出量推算方法,而且在实际生产过程中,也具有可操作性。该方法将为化工生产装置的班产和班耗数据的计量和推算提供有力的支持,并对装置的生产过程提供监控依据。

Abstract: Abstract:An algorithm based on evaluation model is proposed to calculate the production of a chemical plant, which would be an effective solution for time lag in measurement and diverse methods of measurement. Firstly, the new conceptions of plantt boundary and evaluation model are presented. Secondly, the algorithm is proved to be effective theoretically. Finally, a practical example is given.