1 |
谢作旺. 浅析石油企业设备维修成本控制[J]. 科技创新导报, 2010(24): 208.
|
|
XIE Zuowang. A brief analysis of equipment maintenance cost control in petroleum enterprises[J]. Science and Technology Innovation Herald, 2010(24): 208.
|
2 |
TIAN M M, GAO X Y, JIANG Y H, et al. plantwide scheduling model for the typical polyvinyl chloride production by calcium carbide method[J]. Industrial & Engineering Chemistry Research, 2016, 55(21): 6161-6174.
|
3 |
TIAN M M, GAO X Y, JIANG Y H, et al. Decomposition algorithm for the scheduling of typical polyvinyl chloride production by calcium carbide method[J]. Industrial & Engineering Chemistry Research, 2016, 55(47): 12256-12267.
|
4 |
CASTRO P M, MARQUES I. Operating room scheduling with generalized disjunctive programming[J]. Computers & Operations Research, 2015, 64: 262-273.
|
5 |
ZHANG Z, TAN C, GAO X, et al. A mixed integer linear programming model for production scheduling of non-pipelined wells[C]//2019 IEEE 15th International Conference on Control and Automation (ICCA). IEEE, 2019.
|
6 |
GAO X Y, XIE Y, WANG S Q, et al. Offshore oil production planning optimization: an MINLP model considering well operation and flow assurance[J]. Computers & Chemical Engineering, 2020, 133: 106674.
|
7 |
朱昱, 宋建社, 王正元. 一种基于最大保障时间的战时装备维修任务调度[J]. 系统工程与电子技术, 2007(11): 1900-1903.
|
|
ZHU Yu, SONG Jianshe, WANG Zhengyuan. Scheduling model of the battle equipment maintenance task based on the most support time[J]. Systems Engineering and Electronics, 2007(11): 1900-1903.
|
8 |
朱昱, 宋建社, 曹继平, 等. 一种考虑装备维修流程的多维修任务调度[J]. 系统工程与电子技术, 2008(7): 1366-1369.
|
|
ZHU Yu, SONG Jianshe, CAO Jiping, et al. Maintenance task scheduling model of multiunit considering armament maintenance process[J]. Systems Engineering and Electronics, 2008(7): 1366-1369.
|
9 |
王正元, 朱昱, 宋建社, 等. 动态维修任务调度的优化方法[J]. 机械工程学报, 2008(1): 92-97.
|
|
WANG Zhengyuan, ZHU Yu, SONG Jianshe, et al. Optimal method on dynamic maintenance task scheduling[J]. Journal of Mechanical Engineering, 2008(1): 92-97.
|
10 |
王正元, 严小琴, 朱昱, 等. 一种考虑专业的动态维修任务调度的优化方法[J]. 兵工学报, 2009, 30(2): 252-256.
|
|
WANG Zhengyuan, YAN Xiaoqin, ZHU Yu, et al. An optimal method on dynamic maintenance task scheduling with subject taken into account[J]. Acta Armamentarii, 2009, 30(2): 252-256.
|
11 |
吕学志, 于永利, 张柳, 等. 伴随修理中的维修任务调度策略[J]. 系统工程理论与实践, 2013, 33(1): 209-214.
|
|
Xuezhi LYU, YU Yongli, ZHANG Liu, et al. Maintenance task scheduling heuristics in accompanying repair[J]. System Engineering Theory and Practice, 2013, 33(1): 209-214.
|
12 |
吕学志, 王宪文, 范保新, 等. 定点修理中维修任务调度策略的仿真评估[J]. 火力与指挥控制, 2015, 40(1): 70-76.
|
|
Xuezhi LYU, WANG Xianwen, FAN Baoxin, et al. Simulation-based evaluation of maintenance task scheduling strategies in fixed point repairing[J]. Fire Control and Command Control, 2015, 40(1): 70-76.
|
13 |
ACHKAR V G, CAFARO V G, MENDEZ C A, et al. A discrete-time MILP formulation for the optimal scheduling of maintenance tasks on oil and gas production assets[J]. Computer Aided Chemical Engineering, 2019, 46: 727-732.
|
14 |
王浩. 基于蜂群算法的战时毁伤装备维修任务调度研究[J]. 火力与指挥控制, 2009, 34(S1): 141-144.
|
|
WANG Hao. Job-scheduling for damaged equipments in wartime based on wasp colony algorithm[J]. Fire Control and Command Control, 2009, 34(S1): 141-144.
|
15 |
吕学志, 陈乐, 尹健, 等. 考虑休息的维修任务调度模型及其求解算法[J]. 兵工学报, 2014, 35(12): 2116-2123.
|
|
Xuezhi LYU, CHEN Le, YIN Jian, et al. maintenance task scheduling model considering rest time and its solving algorithm[J]. Acta Armamentarii, 2014, 35(12): 2116-2123.
|
16 |
曾斌, 姚路, 胡炜, 等. 考虑不确定因素影响的保障任务调度算法[J]. 系统工程与电子技术, 2016, 38(3): 595-601.
|
|
ZENG Bin, YAO Lu, HU Wei, et al. Scheduling algorithm for maintenance tasks under uncertainty[J]. Systems Engineering and Electronics, 2016, 38(3): 595-601.
|
17 |
昝翔, 陈春良, 张仕新, 等. 考虑时间不确定性的战时装备维修任务调度方法[J].机械工程学报, 2018, 54(24): 226-232.
|
|
ZAN Xiang, CHEN Chunliang, ZHANG Shixin, et al. Task scheduling method for wartime equipment maintenance considering time uncertainty[J]. Journal of Mechanical Engineering, 2018, 54(24): 226-232.
|
18 |
ALOISE D J, ALOISE D, ROCHA C T M, et al. Scheduling workover rigs for onshore oil production[J]. Discrete Applied Mathematics, 2006, 154(5): 695-702.
|
19 |
RIBEIRO G M, LAPORTE G, MAURI G R. A comparison of three metaheuristics for the workover rig routing problem[J]. European Journal of Operational Research, 2012, 220(1): 28-36.
|
20 |
NWADINOBI C P, EZEAKU I I. Review of maintenance scheduling and optimization models[J]. International Journal of Scientific Research in Mechanical and Materials Engineering, 2018, 2(5): 23-35.
|
21 |
陈春良, 刘彦, 王生凤, 等. 装备维修任务调度研究综述[J].装甲兵工程学院学报, 2018, 32(1): 1-11.
|
|
CHEN Chunliang, LIU Yan, WANG Shengfeng, et al. Summary of research on equipment maintenance task scheduling[J]. Journal of Academy of Armored Force Engineering, 2018, 32(1): 1-11.
|
22 |
YOU Fengqi, GROSSMANN Ignacio E. Integrated multi-echelon supply chain design with inventories under uncertainty: MINLP models, computational strategies[J]. AIChE Journal, 2010, 56(2): 419-440.
|