Planning optimization of PVC production by calcium carbide method based on discrete time representation
WANG Yuhong, LIAN Xue, GAO Xiaoyong, FENG Zhenhui, HUANG Dexian, BAI Jianxun
Chemical Industry and Engineering Progress . 2017, (05): 1597 -1604 .  DOI: 10.16085/j.issn.1000-6613.2017.05.006

京ICP备12046843号-2;京公网安备 11010102001994号
Copyright © Chemical Industry and Engineering Progress, All Rights Reserved.
E-mail: hgjz@cip.com.cn
Powered by Beijing Magtech Co. Ltd